Embankment Asset Management System (EAMS)
Health status, patrolling inspection logs, and vulnerability tracking for flood protection bunds, spurs, and revetments.
Total Bund Length
179.1 km
5 major monitored embankments
Emergency Works
1
Elgin-Charsari (Barabanki)
Vulnerable / Watch
2
Malony & Gola-Lakhimpur
Intact / Normal
2
Safe freeboard margins
| Embankment Name | River & District | Total Length | Freeboard Margin | Crest Width | Seepage Status | Health Condition | Executive Engineer |
|---|---|---|---|---|---|---|---|
| Malony Embankment ID: EMB-GOR-01 | Rapti Gorakhpur | 42.5 km | 1.8 m | 5.5 m | Seepage Detected | Vulnerable | Er. V. K. Rai (94150XXXXX) Inspected: 2026-09-09 05:30 IST |
| Elgin-Charsari Bund ID: EMB-BBK-01 | Ghaghra Barabanki | 28 km | 1.4 m | 6 m | Seepage Detected | Critical Work | Er. S. N. Pandey (94151XXXXX) Inspected: 2026-09-09 06:15 IST |
| Hasanpur Ring Bund ID: EMB-BAL-01 | Rapti Balrampur | 18.2 km | 2.1 m | 4.8 m | Dry / Intact | Intact | Er. A. K. Verma (94152XXXXX) Inspected: 2026-09-08 17:00 IST |
| Gola-Lakhimpur Embankment ID: EMB-KHR-01 | Sharda Lakhimpur Kheri | 34 km | 1.2 m | 5 m | Dry / Intact | Vulnerable | Er. Rajesh Gupta (94153XXXXX) Inspected: 2026-09-09 04:45 IST |
| Ballia-Bairia Bund ID: EMB-BLA-01 | Ganga / Ghaghra Ballia | 56.4 km | 2.5 m | 6.5 m | Dry / Intact | Intact | Er. M. P. Singh (94154XXXXX) Inspected: 2026-09-08 19:30 IST |